EDF has revised upwards its nuclear production range for 2024 to between 340 and 360 TWh (instead of the 315 to 345 TWh initially forecast). This revision is the result of improved unit outage performance, industrial control of controls and repair worksites linked to the stress corrosion issue. In 2019, EDF launched the "START 2025" program to improve the efficiency of unit outages, notably by industrializing, capitalizing on and standardizing outage preparation methods...
photo ©EDF archives